Premise details
- Address
- 28 Dogwood Way Milson Palmerston North 4414
- Total beds
- 104
- Service types
- Dementia care, Rest home care, Geriatric, Medical
Certification/licence details
- Certification/licence name
- Julia Wallace Retirement Village Limited - Julia Wallace Retirement Village
- Current auditor
- BSI Group New Zealand Ltd
- End date of current certificate/licence
- Certification period
- 48 months
Provider details
- Provider name
- Julia Wallace Retirement Village Limited
- Street address
- Unit D, Airport Business Park 92 Russley Road Christchurch 8042
- Postal address
- PO Box 771 Christchurch 8140
Progress on issues from the last audit
This rest home has been audited against the Health and Disability Services Standards. During the last audit, the auditors identified some areas for improvement.
Issues from their last audit are listed in the corrective actions table below, along with the action required to fix the issue, its risk level, and whether or not the issue has been reported as fixed.
A guide to the table is available below.
Outcome required | Found at audit | Action required | Risk rating | Action status | Date action reported complete |
---|---|---|---|---|---|
Actual and potential risks are identified, documented and where appropriate communicated to consumers, their family/whānau of choice, visitors, and those commonly associated with providing services. This shall include: (a) Identified risks are monitored, analysed, evaluated, and reviewed at a frequency determined by the severity of the risk and the probability of change in the status of that risk; (b) A process that addresses/treats the risks associated with service provision is developed and im | During the audit, while the auditor was observing in the special care (dementia) unit, the outdoor area was unattended. This area was being painted by an external contractor. During this observation, the area was unattended, not cordoned off, paint was left in a pan on the ground and a long-handled paint brush was left splayed across the ground (note the outdoor area is a narrow space). During this time, a resident was observed to open the door, go outside, and was observed to bend down and insp | Ensure external contractors who work in a dementia unit clearly understand the steps that are required to ensure no residents have access to any hazardous substances. | PA Low | Reporting Complete | |
A medication management system shall be implemented appropriate to the scope of the service. | There are entries in the controlled drug register in rest home and hospital where controlled drugs have been administered and signed with one signature only. | Ensure that there are two signatures when controlled drugs are administered on the controlled drug register. | PA Moderate | Reporting Complete |
Guide to table
- Outcome required
The outcome required by the Health and Disability Services Standards.
- Found at audit
The issue that was found when the rest home was audited.
- Action required
The action necessary to fix the issue, as decided by the auditor.
- Risk level
Whether the required outcome was partially attained (PA) or unattained (UA), and what the risk level of the issue is.
The outcome is partially attained when:
- there is evidence that the rest home has the appropriate process in place, but not the required documentation
- when the rest home has the required documentation, but is unable to show that the process is being implemented.
The outcome is unattained when the rest home cannot show that they have the needed processes, systems or structures in place.
The risk level is determined by two things: how likely the issue is to happen and how serious the consequences of it happening would be.
The risk levels are:
- negligible – this issue requires no additional action or planning.
- low – this issue requires a negotiated plan in order to fix the issue within a specified and agreed time frame, such as one year.
- moderate – this issue requires a negotiated plan in order to fix the issue within a specific and agreed time frame, such as six months.
- high – this issue requires a negotiated plan in order to fix the issue within one month or as agreed between the service and auditor.
- critical – This issue requires immediate corrective action in order to fix the identified issue including documentation and sign off by the auditor within 24 hours to ensure consumer safety.
The risk level may be downgraded once the rest home reports the issue is fixed.
- Action status
Whether the necessary action is still in progress or if it is complete, as reported by the rest home to the relevant district health board.
- Date action reported complete
The date that the district health board was told the issue was fixed.
Audit reports
About audit reports
Audit reports for this rest home’s latest audits can be downloaded below.
Full audit reports are provided for audits processed and approved after 29 August 2013. Note that the format for the full audit reports was streamlined from 16 December 2014. Full audit reports between 29 August 2013 and 16 December 2014 are therefore in a different format.
From 1 June 2009 to 28 February 2022 rest homes were audited against the Health and Disability Services Standards NZS 8134:2008. These standards have been updated, and from 28 February 2022 rest homes are audited against Ngā Paerewa Health and Disability Services Standard NZS 8134:2021.
Before 29 August 2013, only audit summaries are available.
Both the recent full audit reports and previous audit summaries include:
- an overview of the rest home’s performance, and
- coloured indicators showing how well the rest home performed against the different aspects of the Ngā Paerewa Health and Disability Services Standard.
Note: From November 2013, as rest homes are audited, any issues from their latest audit (the corrective actions required by the auditor) appear on the rest home’s page. As the rest home completes the required actions, the status on the website updates.
Audit date:
Audit type: Surveillance Audit
- (docx, 65.93 KB) Julia Wallace Retirement Village - Mar 2024
- (pdf, 163.01 KB) Julia Wallace Retirement Village - Mar 2024
Audit date:
Audit type: Certification Audit
- (docx, 49.06 KB) Julia Wallace Retirement Village - Feb 2022
- (pdf, 191.35 KB) Julia Wallace Retirement Village - Feb 2022
Audit date:
Audit type: Surveillance Audit
- (docx, 34.88 KB) Julia Wallace Retirement Village - Feb 2020
- (pdf, 139.39 KB) Julia Wallace Retirement Village - Feb 2020
Audit date:
Audit type: Certification Audit
- (docx, 47.67 KB) Julia Wallace Retirement Village - Jan 2018
- (pdf, 188.03 KB) Julia Wallace Retirement Village - Jan 2018